www.aptransco.cgg.gov.in Results Assistant Engineer Electrical, Telecom : Transmission Corporation of Andhra Pradesh Limited

Closed Thread
Results 1 to 10 of 10
  1. Post Count Number #1
    Freelancer
    Join Date
    August 18th, 2010
    Location
    India
    Posts
    16,237

    www.aptransco.cgg.gov.in Results Assistant Engineer Electrical, Telecom : Transmission Corporation of Andhra Pradesh Limited

    For easy downloading of the results, the data received from the University was split into two files. In the process of sorting the data through System software, certain mistakes crept in, while uploading to the website. Having noticed the said mistakes, the website was again updated with a single file which reflects the correct sorting of data with correct marks secured by candidates. The inconvenience caused to the candidates is regretted. The said mistakes emerged due to inadvertence.

    http://aptransco.cgg.gov.in/
    http://aptransco.cgg.gov.in/Documents/electrical.pdf

    Question papers and key are placed in AP Transco website i.e aptransco.gov.in and aptransco.cgg.gov.in .

    In addition to the above, all OMR sheets are being kept in the website for verification by the candidates. The candidates can access the above data by typing their Hall Ticket number and Date of Birth from 17.02.2012 onwards to 25.02.2012. If they still require any clarification, they may dial telephone Nos: 23399391 and 23399392. (From 10:30 AM to 5:00 PM).

    HTNO CNAME DOB MARKS
    100002 A LAVANYA 20/05/1986 48
    100003 A RAMA DEVI 23/11/1987 45
    100004 A RAMANA 06/05/1988 30
    100005 A ROSHINI 23/06/1990 41
    100006 A ABDUL LATHIEF 09/08/1990 48
    100007 A ABHILASH GOUD 23/01/1990 33
    100009 A ADI NARAYANA 15/06/1987 33
    100010 A ADITHI 02/10/1988 39
    100012 A AMARNATH 12/03/1987 18
    100013 A AMULYA 10/04/1990 25
    100014 A ANIL KUMAR 25/06/1988 35
    100015 A ANJAIAH 08/02/1989 24
    100016 A ANJAIAH 12/05/1983 32
    100018 A ARCHANA 20/11/1986 56
    100019 A ARJUN KUMAR 02/06/1990 52
    100020 A ARJUNA RAO 14/09/1977 47
    100021 A ASHOK GOUD 14/07/1988 59
    100022 A ASHOK KUMAR 01/02/1988 41
    100023 A ASHOK KUMAR REDDY 24/05/1989 40
    100024 A ASWARTHA NARAYANA RAO 10/06/1990 57
    100025 A B CHAITHANYAKUMARYADAV 08/08/1990 31
    100026 A B S RAMANJANEYACHARI 05/06/1989 25
    100027 A B SIVASANKAR 20/07/1989 35
    100028 A B SURYAKIRAN GOUD 22/11/1981 50
    100029 A BALA JESU 04/05/1987 42
    100030 A BALAJI 06/08/1985 42
    100031 A BALAJI 27/07/1987 26
    100032 A BALAJI KIRAN 06/01/1989 74
    100033 A BALAVENKATASRAVANKUMAR 17/08/1985 51
    100034 A BAPU 06/06/1981 31
    100035 A BHAGYA LAXMI 04/09/1987 28
    100036 A BHANU PRAKASH 03/11/1981 44
    100037 A BHARATA KUMAR 04/08/1986 42
    100038 A BHARATH KUMAR 27/02/1987 39
    100039 A BHARGAVA PRASANNA KUMAR 03/03/1990 51
    100040 A BHARGAVI 02/01/1990 41
    100041 A BHASKAR 14/06/1988 33
    100042 A BHASKARA BABU 23/05/1985 34
    100043 A BHAVANI 13/11/1988 31
    100044 A BHUVANESHWARI DEVI 05/06/1987 33
    100045 A CHAITANYA 27/04/1988 27
    100047 A CHANDRA SEKHAR 21/02/1988 42
    100048 A CHANDRA SEKHARA NAIDU 15/08/1984 28
    100049 A CHANDRAIAH 09/05/1984 33
    100050 A CHANDRASHEKAR 15/08/1990 20

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Mistakes in APtransco official key

    1)40w glows brighter (not 50w)
    2)airblast CB (not all CB)but not sure
    3)capacitor bank is employed vacuum CB (not air blast CB)
    4)E,p/4 (not E,p/2)
    5)LG fault is high on alternator (not 3-ph fault)
    6)syn speed in A&B (not B&C)
    7)Bias is operating ct coil/restaing ct coil (not operating coil/restaing coil)
    8)c(t-1)u(t-1) (not c(t)U(t-1))
    9)cro question small phase diff (not their frequencies are not same)
    10)compators 7 (not 8)
    11)load inductance only (not both resitance and inducatance)
    12)Induction Heating= Frequency is High
    13)In Guass Siedel method= unreliable convergence is the wrong statement
    14)Phase Lead compensation= both peakovershoot and risetime decreases
    15)4-point starter is used for field weakening method
    16)Thyristor can be turned off by= after making current less than holding current, we should make anode voltage negative by external commutation circuit

    Good job spotting the mistakes. Let us hope for the best. Deserving candidates should not get affected by these mistakes.

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    APTRANSCO 2012 WRONG KEY

    THERE ARE MANY MISTAKES IN THE KEY
    AT AROUND 13 WRONG ANSWERS ARE THERE
    I HOPE APTRANSCO RECORRECTS ALL THE OMR SHEETS AGAIN AND PLACE THE RESULTS

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    APTRANSCO RECORRECTION OF OMR SHEETS

    UNOFFICIALLY THERE ARE SOME NEWS THAT OMR SHEETS OF ALL CANDIDATES WILL BE RE-CORRECTED WITH CORRECT KEY
    HOPE IT HAPPENS AS SOON AS POSSIBLE

    Thanks for the info

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    AP High Court Given stay on aptransco ae (electrical) exam

    Honorable AP High Court Given stay on aptransco ae (electrical) exam recruitment process on march 5th for 4weeks.

    Thanks for the news.

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    4 weeks has already completed why still there is no verdict on the issue can anyone provide info plz

  7. Post Count Number #7
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    sir, pls tell me there is negative marks in aptransco sub engineer exam........ pls it's urgent sir replay must with in 24 hrs

  8. Post Count Number #8
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    telecom assistan engineer

    when am going to get telecom assistant engineer ap list of hyderbad

  9. Post Count Number #9
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    aptransco verdict

    will transco place the OMR sheets again in Website?

  10. Post Count Number #10
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    aptransco interviews

    i was selected in merit list list(telecom,BC-B lady,40 Marks,Rural Hyderabad Zone ), but interview date has not been announced yet.