Help
Home
Search the Forum
You are Here :
Forum
Jobs
Site, Construction, Maintenance
ITM Projects : Mumbai : QA/QC Engineer
Ask Question / Post resume
Post a reply to the thread:
ITM Projects : Mumbai : QA/QC Engineer
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest-IJT;99580]SANJEEV KUMAR [B]Email [/B]:sanjeev_158 AT yahoo.co.in Seeking assignment for maintenance/ commissioning in electrical engineering with an organisation of high repute and to be part of it, which enables me to contribute to its advancement & growth by utilizing my abilities & experiences in areas of Management & Engineering of EHV Equipments and its operation & maintenance. PROFESSIONAL PROFILE - B.E. (Electrical Engineering) from Bhopal Institute of Technology & Science,Bhopal affiliated to RGTU Bhopal, (MP) in 2008 with over 2.5 years of experience in total 410MW Power Plants. (2 x150 MW, 1 x 77 MW& 1 x 33 MW power plant). - Currently designated as Member (Electrical operation & Maintenance Division) with Bhushan Steel limited Angul(orissa). - Proven abilities in site management with utmost importance in safety, quality and progress. - Keen understanding of the formalities and implementation of Quality Systems and excellent skills in complying with the norms of Regulatory Authorities. - An enterprising leader with abilities in leading multi-skilled motivated teams to achieving organisational goals and industry best practices. [B]Total Experience [/B]: 2years 6 months. [B]Current project [/B]: 410 Mw power plant (maintenance) [B]Current designation [/B]: Electrical Engineer [B]Current location [/B]: Angul(orissa). [B]Current Employer [/B]: Bhushan Steel Limited. [B]Current CTC [/B]: Rs.2.6 lakhs/annum +accommodation +incentives [B]Expected CTC [/B]: Negotiable. AREA OF EXPERTISE - Maintenance & Operation activities of Generator, Transformer, HT & LT switchgear, LT Motors, Generator-Transformer Bus-duct , 220KV&33KV switchyard and other EHV equip. - Control room operations, i.e. synchronization operation, maintaining operational parameters, maintain import/export of power as per requirement, Power Restoring Management in Black out Condition. - Maintenance & Operation of power transformers such as 11/220 KV (100 MVA), 33/6.6 KV (30 MVA) and other auxiliary transformers. - To maintain smooth operation of 410 MW Power Plant. - Trouble shooting of electrical faults. - Assessment of feasibility & preparation of plan/drawings to set up Electrical panels at particular site. - Proficiency in managing & Planning, Manpower planning, & handling of contractors, material handlings, setting up targets for zero delay and achieve. - Operation & maintenance of ESP Ash Handling System controlled by PLC. - Review of Electrical protection schemes of distribution transformer protections, power transformer protections, station and auxiliary switchgears and its interlock, etc checking. - Review of Schematic SLD and HV electrical system schemes. - Preparation of checklist for charging of various electrical panels, transformers , 33 KV& 220 KV switchyard (AIS) and distribution boards. Generation of energy report at shift end, issuing electrical shutdown permits, responsible for safety audits along with other safety aspects. CAREER HIGHLIGHTS - Presently working with Bhushan steel Limited, as electrical maintenance engineer in 410MW power plant since March 2010 to till Date. Since July 2008 to feb.2010 in Ind synergy Ltd, as an Asst. Engg. In 34 Mw power plants. ACADEMIC CREDENTIALS - B.E (Electrical & Electronics) from Bhopal Institute of Technology & Science, Bhopal affiliated to RGTU Bhopal(MP) with First with Hons. in 2008. - Intermediate or (10+2) equivalent from Bihar Intermediate Education Council Patna(Bihar) in 2002 - Passed HSLC JNV Begusarai(Bihar), in 2000 . [B]- Soft Skills [/B]: Windows XP, MS Office, Excel INDUSTRIAL TRAININGS /EXPOSURE - Undergone training in STEEL AUTHORITY OF INDIA LTD (BOKARO) - Successfully completed the final year project on “Speed control of DC motor by using 89C51 microcontroller. - Successfully completed the Pre final year project on “Speed control of DC motor by using PWM Speed control. ORGANIZATIONAL DETAILS Bhushan Steel ltd. combines deep expertise with the best technology that the world offers to integrate the entire steel manufacturing process – from mining to the production of value-added products. It also generates captive power using gases from the process.[/QUOTE]