Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
Bridge Construction Civil Site Engineer : Resume CV
Ask Question / Post resume
Post a reply to the thread:
Bridge Construction Civil Site Engineer : Resume CV
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest-IJT;69399][b][u]CURRICULUM VITAE [/u][/b]: [b][u]CAREER OBJECTIVE [/u][/b]: To find a career that challenges my acumen to the ‘extreme’.. To support my team with useful contributions setting standards and leading by examples. [b][u]EDUCATIONAL QUALIFICATION [/u][/b]: B.Tech CIVIL ENGINEERING COLLEGE OF ENGINEERING, BHUBANESWAR B.P.U.T. June 2010 7.5 cgpa Intermediate 10+2 SCIENCE/ PCBM NAYAGARH COLLEGE, NAYAGARH C.H.S.E. March 2006 80.3 Matriculation GENERAL BAMAN ABAKASH HIGH SCHOOL, ITAMATI H.S.C. March 2004 80.8 [b][u]TECHNICAL SKILLS [/u][/b]: - AUTOCAD- 2008 In Central tool room and training center. (CTTC) - MS-OFFICE- Including DOS, Excel, Word, PowerPoint. [b][u]TRAINING [/u][/b]: [b][u]Project Name [/u][/b]: Construction of flyover from Rajmahal to Kalpana square, and underpath from mastercanteen to sishu vavan square. [b][u]Project cost [/u][/b]: 66 crores during the first stage of construction. [b][u]Client [/u][/b]: R&B, DIV-II, BHUBANESWAR. [b][u]Responsibilities [/u][/b]: 1. Study of drawing, soil testing report. 2. Preparation of BBS. 3. Survey Works including leveling and Earth cutting work. 4. Detail study about Open Foundation. WORKING EXPERIENCE [b][u]Organization Name [/u][/b]: Royal Infraconstru Ltd. [b][u]Designation [/u][/b]: Site Engineer. [b][u]Duration [/u][/b]: June, 2010 to till date [b][u]PROJECTS UNDER THIS ORGANIZATION [/u][/b]: [b][u]Project Name [/u][/b]: Construction of substructure and super structure of Eight number of major bridges at km 50.009 to km 90.570 in connection with construction of new B.G Railway line between Koderma to Giridih. [b][u]Project Cost [/u][/b]: 22 crores. [b][u]Client [/u][/b]: East Central Railway [b][u]Project Name [/u][/b]: Balance work of earth work in cutting, filling, compaction, turfing, blanketing, minor bridges including RUBs etc & other associated work (reach VII, ch km 87.00 to 94.50) and construction of foot over bridge, platform shed and other works between Koderma –Dhanwar section in connection with construction of new B.G Railway line of Koderma Giridih section. [b][u]Project Cost [/u][/b]: 23 crores. [b][u]Client [/u][/b]: East Central Railway. [b][u]Project Name [/u][/b]: Construction of foundation, substructure and super structure of bridges at North Tripura site [b][u]Project Cost [/u][/b]: 110 crores. [b][u]Client [/u][/b]: P.W.D. and B.B.U.N.L. [b][u]Project Name [/u][/b]: Construction of new Railway bridge of span (a)2x12.2m+1x18.3m.(b)3x18.3m,(c)1x18.3m (d)1x18.3m,(e)7x18.3m,(f)1x18.3m,(g)6x18.3m with composite girder, assembling and errection of 30.5m span girder( excluding supply of girder) in superstructure and bored cast-in-situ RCC piles/open foundation in connection with new B.G Railway line between Deoghar- Katuria. [b][u]Project cost [/u][/b]: 17.93 crores. [b][u]Client [/u][/b]: Eastern Railway [b][u]JOB RESPONSIBILITIES [/u][/b]: 1.Study the details about the foundation used( open foundation, pile foundation) , drawings, soil testing reports, design mix reports etc. 2.Preparaton of BBS. 3.Preparation of Daily Progress Report in accordance with B.O.Q. 4.Preparation Of Billing OF sub contractors and Client. 5.Daily Site visiting. 6.Client handling. 7.Survey works including the checking of center line, leveling and calculation of quantities of earth cutting and earth filling by using Autolevel and Total Station. 8.Reconciliation of materials including reinforcement, cement, fine aggregate, coarse aggregate, bentonite, boulder etc. 9.Reconciliation of Ms plates, Ms pipes, hand jack, propped jack, pipe clamp etc, 10.Laboratory testing of concrete, fine aggregate and coarse aggregate. 11,Preparation of Bar chat in accordance with the date wise activities. 12.Checking shuttering and layouts. 13.Supervising the whole work. 14. Have seen the pile load test and girder launching. [b][u]Language known [/u][/b]: ENGLISH, HINDI, ORIYA, BENGOLI [b][u]DECLARATION [/u][/b]: I hereby declare that all the above mentioned information is true & complete to best of my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. [b][u]Place [/u][/b]: BHUBANESWAR [b][u]Date [/u][/b]:[/QUOTE]