Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
Telecom Transmission engineer : Resume
Ask Question / Post resume
Post a reply to the thread:
Telecom Transmission engineer : Resume
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=swarnadeep dash;264353][b][u]CURRICULUM VIATE [/u][/b]: SWARNADEEP DASH [b][u]E-MAIL [/u][/b]: (dash.swarnadeep AT gmail.com ) ( swarnadep.dash AT sify.com ) [b][u]ACADEMIC [/u][/b]: B.E . in ELECTRONICS & TELECOMMUNICATION form INSTITUTE of TECHNOLOGY BHUBANESWAR under UTKAL UNIVERSITY IN 2002. [b][u]SUMMARY [/u][/b]: - Over 8+ years of extensive & comprehensive experience in ,Strategic Planning, Project Management, Testing & Implementation, Technical Evaluation, Network Implementation ( RF, Microwave, SDH, Fiber) as per Design of GSM, Operations & Maintenance, Installation & Commissioning . - Currently Involving in Upgradation of Transmission Network (OFC) of NLD&ILD as per Planning for RELIANCE NETWORK. - Point-to-point microwave radio network (SDH and PDH) design . preparation of Final Link Engineering Reports (FLER). Design including Microwave antenna height, EIRP, RSL, Fade Margins, availability, frequency planning and interference analysis using Pathloss Planning Tool (PL4). - Plan the Implementation activities for given roll out of sites as per targets in the circle, Identify and mobilize required resources. - Manage and coordination with the entire spectrum of technical a Project Management, Vendor Management, Supplier Quality Assurance and Inventory Management. - Proficiency in handling Project Management, Material Management, Vendor Management & SAP MM Module, Procurement from across the globe & Coordination skills along with the ability to support multiple & simultaneous projects. - Extensive experience on MOTOROLA, NOKIA , ALCATEL & ZTE BTS. - Extensive experience on Transmission equipment like (NEC & NOKIA equipment). - Extensive experience on MUX ( Like Marconi UC1/4 MUX, Orion CPE MUX & FIBCOM ). [b][u]Project completed successfully [/u][/b]: a) Reliance MW UPGRADATION ( 550 Hops ) for 3G network. b) Reliance 2G REVAMP ( 800 New MW links + 560 Alcatel BTS ) c) Reliance 2G SWAP BTS ( 243 Motorola to Alcatel BTS & 308 ZTE to Alcatel BTS ) d) TTSL-Odisha MW project ( 755 new MW links ) e) UNINOR-Odisha MW project ( 330 new MW links ) f) Reliance 931 new sites ( Motrola + Alcatel + ZTE ) g) Reliance BTS SWAP ( Motorola to Alcatel BTS & Motorola to ZTE BTS ) h) Reliance 174 sites upgrade from OUTDOOR to INDOOR site. i) Successfully handled Utility Upgradation of 176 sites for RELIANCE NETWORK [b][u]Current Employer [/u][/b]: Presently working as a Circle I&C LEAD in Alcatel Lucent Managed solution , Since December 2010 - till date. [b][u]Responsibilities - [/u][/b]: - Currently Involving in Upgradation of Transmission Network (OFC) of NLD&ILD as per Planning for RELIANCE NETWORK - Release of IFC drawings /Plan , Preconstruction survey and Submission of ROW applications & Demand note collection, Demand Draft against Demand Note , ROW Program Management , Mobilization of Manpower and Machinery, Execution of work at site, Site Handover and Documentation, Acceptance Testing & Audit, Bill Submission & Material reconciliation - Splicing of fiber optic cables using Fusion Splicer and Mechanical splicers - Testing of fiber optic cables using OTDR - Involved in Rollout plan of Reliance-GSM ( 2G , 3G & Swap ) sites in Odisha. - Actively engaged in executing 3G Txn project rollout that includes New IP RADIO, PDH to IP RADIO upgrades, SDH upgrades and existing PDH upgrade to 3G packets. - Comprehension and Communication of Project Objectives, Scope, Timelines, Testing, Documentation criteria to Internal ALUMS Teams/Vendors. - Project Planning, resource requirement analysis and risk Assessment. MIS, Daily Project Progress Tracking/Reporting. - Tracking, monitoring and reporting Deployment progress. Tracking and reporting Project Costs. Coordinate with warehouse for correct material deliveries. - Project Escalations’ Management. Documentation sign offs. Project Spares Management. - Updating of databases as necessary for circle operations. - Subcontractor Management to achieve/exceed targets & maintaining on-time performance, with set quality standards. Ensuring proper project Logistics Management. - Finalization of BOM / BOQ. Subcontractor training for Project Documentation & Invoicing. - Maintaining circle internal audit reports as per schedule. - Issuance of work completion certificates, Invoice & other claim approvals& Vendor Meetings. - Tracking Vendor invoices & Payments. - Responsible for MW network installation & commissioning. - Responsible for MW related fault identification & support for corrective action. - Commissioning of 3G IP radio. - Cross connection in STM-1 with through mode and channelized mode. - Up gradation of license key and installing clock card & STM card. - File down load of VLAN setting. - Trouble shooting with ipasolink200(E1/STM-1 Card) - Ipassolink200 LCT equipment Setup & Provisioning of Main Radio Parameters - Up gradation of Ipasolink200 for PDH to IP radio & SDH to IP radio for 2G & 3G technology. - I&C of 2 port Ethernet card in PDH hops for 3G technology. - I&C of HUWAEI CX200 router for 3G technology. - Coordation with ZTE team for NODE B integration. - Swapped BTS from Motorola to Alcatel , Alcatel to ZTE & Motorola to ZTE - Swapped BSC from Motorola to Alcatel , Alcatel to ZTE & Motorola to ZTE - TRX upgradation of BSC & BTS - I&C of Alcatel BTS - DT tracking - Ensure any fault is cleared within required SLA, escalating faults as required in order to meet these SLA's. [b][u]Previous Employer [/u][/b]: 1. Worked in NEC INDIA PVT. LTD., Since December 2009 - December 2010. [b][u]Responsibilities - [/u][/b]: - Involved in Rollout plan of TTSL ( GSM & CDMA ), IDEA & UNINOR network in Odisha. - Monitoring project work. - Point-to-point microwave radio network (SDH and PDH) design . - Preparation of Final Link Engineering Reports (FLER). - Design including Microwave antenna height, EIRP, RSL, Fade Margins, availability, frequency planning and interference analysis using Pathloss Planning Tool (PL4). - Co-ordination with the IP Vendors like WTIL,GTL,TND,AIRCEL,BHARTI, ATC, QUIPPO, RTL, ITIL, ets. For Timely execution of work. - Co-ordination with the local Vendors for Timely execution of work. - Plan the Implementation activities for given roll out of MICROWAVE HOPS as per targets. - Identify and mobilize required resources. - Provide Status Reports and Updates on a regular basis to concerned Project Manager - Materials management & equipment shipment. - Coordination of LOS Survey team on daily basis. - Knowledge in Link Budget Preparation, Network Planning. - Responsible for installation, commissioning and ATP of NEC Microwave Radio. 2. Worked in Alcatel lucent management solution, Since April 2009 to Nov 2009. [b][u]Responsibilities - [/u][/b]: - Installation, commissioning & integration of MOTOROLA, ALCATEL & ZTE BTS. - Restoration of fiber cut to minimize MTTR - Ensure any fault is cleared within required SLA, escalating faults as required in order to meet these SLA's. - Swapped BTS from Motorola to Alcatel & Motorola to ZTE - Involved in Rollout plan of RELIANCE ( GSM ) network in Odisha. - Monitoring project work. - Identify and mobilize required resources. - Co-ordination with SITE engineers for upgradation & Degrow of TRX - DT Tracking. - Co-ordination with Reliance warehouses & other vendors for the replacement of faulty components . [b][u]- Attained comprehensive knowledge of handling [/u][/b]: O&M tools such as Site master , Power meter, GPS [b][u]3. Worked in Reliance COMMUNICATION,Since June 2007 to March 2009 .Responsibilities - [/u][/b]: - Involved in Rollout plan of RELIANCE network in Odisha. - Monitoring project work. - Co-ordination with the Vendors ( Alcatel , ZTE , Motorola ) for Timely execution of work . - Plan the Implementation activities for given roll out of sites as per targets. - Identify and mobilize required resources. - Provide Status Reports and Updates on a regular basis to concerned Project Manager - Materials management & equipment shipment . - Responsible for installation, commissioning, Integration and AT. - Involved in the Transmission related activities like E1 Provisioning. - Installation, commissioning of NEC microwave equipments. - Installation, commissioning of PDH and SDH Microwave .(NEC PASOLINK , PASOLINK+ & PASOLINK NEOi ). - Installation, Commissioning & Integration of Marconi UC1/4, Orion CPE MUX and FIBCOM MUX. - Installation, commissioning & integration of MOTOROLA BTS & ALCATEL BTS. - Swapped BTS from Motorola to Alcatel & Motorola to ZTE 4. Relcom Engg. Pvt. Ltd. January 2006 – May 2007 (1.4 years ). [b][u]Responsibilities - [/u][/b]: - Installation, commissioning & integration of NOKIA BTS (ultra & metro sites). - Installation , commissioning of NOKIA FLEXIHOPPER ( both 1+0 ,1+1 ( HSB)), ) - Making the site ON AIR by assigning the required E1. - COMPLETE SITE SURVEY - PROPERLY GSM ANTEENA & MICROWAVE ANTENNA INSTALATION. - FEDDER (RF) CABLE & IF CABLE INSTELATION &PROPERLY RUTE. - ALL TYPE INTERNAL & EXTERNAL BTS CABLEING. - PROPERLY POWER PLANT INSTALATION & CABLEING. - BATTERY BANK INSTALATION CABLEING. - BTS ALARAMS CABLEING & ALL ALARM TESTING TOWARDS OMCR. 5. SRIRAM COMMUNICATION PVT LTD. JUNE 2005 - December 2005 [b][u]Responsibilities - [/u][/b]: - Installation, commissioning & integration of NOKIA BTS (ultra & metro). - Installation, commissioning of NOKIA FLEXIHOPPER (1+0) - Making the site ON AIR by assigning the required E1 6. ACME PVT. LTD. May 2004 – April 2005 [b][u]Responsibilities - [/u][/b]: - Installation, commissioning & integration of NOKIA BTS (ultra & metro). - Installation, commissioning of NOKIA FLEXIHOPPER (1+0) - Making the site ON AIR by assigning the required E1. [b][u]References [/u][/b]: Available on Request[/QUOTE]