Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
Energy Auditor : Resume
Ask Question / Post resume
Post a reply to the thread:
Energy Auditor : Resume
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;254748][B]RESUME:[/B] SOMNATH MAITI somnath.2007 AT yahoo.co.in [B]Professional Experience in brief [/B]: Graduate Electrical Engineer & BEE certified energy auditor with more than 8 years experience in the field of industrial project as well as HV transmission line project, switchgear manufacturing unit & maintenance of steel plant & cable manufacturing plant. [B]Personal Details [/B]:- [B]Date of Birth [/B]: 10th September, 1978 (10-09-1978) [B]Marital Status [/B]: Married [B]Language Known [/B]: Hindi, Bengali & English [B]Nationality [/B]: Indian [B]Educational Qualifications [/B]:- Energy auditor certified by BUREAU OF ENERGY EFFICIENCY (BEE) Ministry of Power,Govt. Of India. [B]Examination Passed University/Board Year of Passing Percentage :[/B] A.M.I.E (SEC.B) ELECTRICAL (Equivalent to B.E.) The Institution of Engineers (India). 2004 54% A.M.I.E.(SEC.A) ELECTRICAL (Equivalent to B.E.) The Institution of Engineers (India). 2002 53% HIGHER SECONDARY (10+2) (Pure Science) W.B.C.H.S.E 1997 50% MADHYAMIK (SECONDARY) W.B.B.S.E 1995 69% [B]Salient Points [/B]:- i) Secured 3rd position in the Section-A exam. of the Institution of Engineers (India) from the Kolkata exam. centre during summer 2002. ii) Project work after passing Section -A of A.M.I.E. Exam. [B]Nature of Project [/B]: Trouble shooting and remedies of Transformers and D.C. Machines under registered with – Mr. S. K. Sinha. General Manager, Power Grid Corporation of India [B]Computer Knowledge [/B]: Completed “Carrier edge” Course (FFN) from NIIT. Course contains [B]Professional Experience [/B]:- MS OFFICE, MS EXCELL,MS POWER POINT, INTERNET , E-MAIL etc. Knowledge in ERP. [B] Name of Employer Designation Duration of Service :[/B] Crystal cable Industries Ltd Maintenance Consultant 10.09.2009 to Continue Arcvac Forgecast Ltd. Asst. Engineer 01.11.2007 to 09.09.2009 SAIT Mine Line Pvt. Ltd. Engineer 01.02.2006 to 31.10.2007 S.R. Enterprise Engineer 02.06.2003 to 31.01.2006 [B]JOB DUTIES & RESPONSIBILITIES [/B]:- 1. CRYSTAL CABLE INDUSTRIES LTD. ANDUL ROAD, HOWRAH. - Responsible for all electrical preventive & breakdown maintenance. - Responsible for preparation of corrective & preventive action plans for plant & Machineries for optimum utilization. - Preparation of routine monthly indenting control. - To raise indent other than monthly whenever needed. - Planning for the spares of all electrical items to maintain minimum inventories. - Budget control related to electrical maintenance. - Responsible for ISO related matter. - Vendor development according to department’s requirement. - Responsible for status of statutory compliance of transformer oil. - Responsible for looking after AMC status of DG set, UPS, compressor, boiler etc. - Plan for yearly calibration of all equipments along with environment related equipments. - Preparation of weekly as well as monthly reports for management. Eg. Breakdown details of each equipments, Manpower utilization in maintenance department. - Maintaining plants power factor, load factor within the specified value, analyzing power consumption of each equipment & do the appropriate modification to save energy. - Analysis of power bills for power consumption reduction possibility. - Coordinating energy saving awareness program among people to survive in the industry. [B]2. ARCVAC FORGECAST LTD :[/B] (SMITHY GROUP) DANKUNI, HOOGLY. - Executing breakdown maintenance of steel melting shop (SMS) & forge shop equipments like EAF, LRF, VD, EOT crane, HT & LT transformer, motor, MCC & PCC panel, reheating furnace, heat treatment furnace, band saw, manipulator etc. - Minimize breakdown time of machines in line with target - Installation of AC & DC drives. - Planning & executing preventive maintenance jobs & recording in PM cards. - Preparation of preventive maintenance & history card. - Raise the indent related to electrical items. - Plan preventive maintenance schedule. - Distribution of works between maintenance Staffs & blue collars. [B] 3 SAIT Mine Line Pvt. Ltd : [/B](Kolkata) - Installation & commissioning of mining FLP transformer, stator rotor panel, DOL starter, star-delta starter etc. - Testing of transformer, stator rotor panel, DOL & star delta starters etc. Type of testing done – Circuit logic, earth leakage test, short circuit test, I/O ratio test, HV insulation test etc. - Handling of VCB, contactors & various types of relays & timers. [B]S. R. Enterprise :[/B] (Kolkata) - Installation & commissioning of lighting & power project job also building earthing at Apollo Gleneagles Hospital Ltd. 58, Canal Circular Road, Kol – 54. - Installation & commissioning of lighting projects, cable laying, motor earthing and maintenance of plant machines at Woodlands Medical Center Ltd, Alipore, Kol – 27. Many more project jobs supervision, job planning, organizing, execution, negotiation & reporting to the authority. - HV TRANSMISSION LINE PROJECT (400KV) FROM MADURAI TO PUGULAR UNDER ASSOTIATE COMPANY OF GAMMON GROUP. - Commissioning of foundation, erection & stringing at sites. - Checking of template alignment, pit size, materials, steel binding etc as per drawing. - Cable laying in HT, LT & control cable in 33/6.6KV substation. - Installation, testing & commissioning of PCC & MCC panels. - Handling of total man power of site. - Reporting to the higher authority about project progress. [B]Place [/B]: Andul,Howrah [B]Date [/B]: (Signature) SOMNATH MAITI[/QUOTE]