Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
QC Painting Inspector : Resume
Ask Question / Post resume
Post a reply to the thread:
QC Painting Inspector : Resume
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;251036]CV NARAYAN H. KHARATMOL E-mail - nareshvk78 AT yahoo.co.in, naresh.kharatmol AT gmail.com [B]EXECUTIVE SUMMARY [/B]: - Presently working in VELOSI Certification Services, as a Client Representative of ‘ABU DHABI COMPANY FOR ONSHORE OIL OPERATION (ADCO) in Oil & Gas Project BAB THAMAMA ‘G’ & HABSHAN- 2 DEVELOPMENT 1.8 MMBOPD’ Abu Dhabi UAE*. [B] Professional experience [/B]: Certified BGAS PAINTING INSPECTOR with more than 18 years of experience in the Painting & coating for the oil & gas industry and worked for more than 12 Years in Gulf countries & Africa like Oman, Qatar, and UAE, & Angola. Worked on RASGAS, Qatar Petroleum, Shell GTL projects and more. [B]Technical knowledge [/B]: Have been inspected in various type of structure and materials i.e. offshore structure Buoys, Helideck, Boat Landing, Buoyancy tank, Production manifold, Piles, Stringer, Mud mats, Jumpers, Travelling Protection, Riser, Jackets and onshore structures storage tanks & vessels (reactors, pressure vessel, heat exchanger, Cryogenic, Columns) piping, cross country pipe lines, Horizontal direct drilling (HDD) pipe lines in various types of plant including new construction & live plants which is Refineries, fertilizer, LNG Gas plants, Petrochemicals, oil & gas facilities, Shipyard, subsea (Deepwater), Rigging fields and offshore projects. Practical experience of which includes actual inspection, verification, recommendation of desired coatings monitoring of construction and installation activities associated with piping works, & coating application and testing. Completion & Commissioning of Relevant Projects and Documentation. - Having sound knowledge in various types of Surface preparation i.e. Ultra High pressure water Blasting (UHP), Abrasive Blasting including short & Grit blasting and Power tool cleaning. Thermal Spraying (metallization), installation GTS – Polypropylene (PP) Heat Shrink Sleeve (HSS) of pipe line, Glass flacks lining, wrappings. Familiar and demonstrate thorough working knowledge with International Codes such as SSPC, ASTM, ISO BGAS & NACE Standards, Norwegian Standards Organization (NORSOK), Deutsches Institute for Normung (DIN). [B]EDUCATION & TRAINING [/B]: Education information : Diploma in Mechanical Engineer Institute : Eastern Institute for Integrated Learning in Management - December 2011 [B] Certification Qualification [/B]: BGAS PAINTING INSPECTOR GRADE – 2 [B] Projects:[/B] [B]ADCO [/B]: BAB THAMAMA ‘G’ & HABSHAN-2 Development 1.8 MMBOPD project in Abu Dhabi UAE [B]Transocean [/B]: Drilling Projects National and International overseas fields [B]Exxon [/B]: AB15 Gas Gathering and Kizomba Satellites Projects at Lobito (Angola) [B]British Petroleum [/B]: Piles, Production Manifold and MSS Projects at Lobito (Angola). Total- Buoy, Helipad, Pazflor subsea, Surf, Boat landing, Girri and Block 15 Projects at Lobito yard (Angola). [B]KBR & JGC [/B]: Shell GTL projects in Qatar – 2009 (Qatar) [B]Qatar Gas [/B]: Annual Shutdown for Train 3 - 2007 (Qatar) [B]Ras Gas [/B]: Ras Gas Expansion projects - Trains 4, 5, 6 and 7 (Qatar). [B]Qatar Petroleum [/B]: (QP- Hallul islands an emergency shutdown2005 (Qatar) [B]Q-Chem. [/B]: Annual Maintenance of Painting & Insulation – 2006 (Qatar) [B]Lamprell Energy [/B]: Annual maintenance of Rig Repairs at Khalid port (UAE) [B]PERSONAL DETAILS [/B]: [B]Nationality [/B]: India [B]Date of Birth [/B]: 18 February 1973. [B]Civil Status [/B]: Married. [B]Languages [/B]: English, Hindi and Marathi [B]WORK EXPERIENCES [/B]: [B]Duration [/B]: Oct- 2011 – Present [B]Organization [/B]: VELOSI CERTIFICATION SERVICES LLC. (UAE) [B]Project Name [/B]: BAB THAMAMA ‘G’ & HABSHAN-2 Development 1.8 MMBOPD ABU DHABI (UAE) [B]Designation [/B]: Third Party Inspector (Painting/coating/Insulation) [B]Responsibility [/B]: - Surveillance of surface preparation & paint/coating application - Attending daily RFI’S which rise by contractor. - Monitoring climatic condition like air temperature, Dew point, Relative Humidity, Steel temperature, paint mixing, paint storage condition, batch certificate, paint shelf life etc. - The visual inspection of pipe, Plate and structures for mechanical damages like sharp edges, lamination, welding spatter, slag - Witness the HDD, pin brazing, continuity test, Heat Shrink Sleeve installation of 3”, 6”, 8”, 16”and 20” dia pipeline, and pipe lowering pig launching, internal pipeline cleaning & gauging and so on. - Witnessing all quality test carried by contractor like Profile reading, chloride test, high voltage Holiday, peel off, pull off test. - Surveillance of Hot insulation (Rock wool & Solartech laminates sheet) - Witnessing to PQT & raised QCR or NCR whenever applicable. - Making punch list, attending QC meeting. - Review QC report and sign off [B]Duration [/B]: April 2011 – Sep. 2011 [B]Organization [/B]: OCS SERVICES (INDIA) PVT LTD. [B]Project Name [/B]: Drilling Rig – ONGC Basin Field. Bombay high – India. [B]Designation [/B]: Coating Inspector [B]Responsibility [/B]: - Responsible for UHP blasting & Painting in sensitive areas like pump rooms, drilling platform, Splash zone areas. Submerge zone, main deck, Helideck, Bottom plate, Flare areas, derrick, Gear units, Legs, Hull, tanks etc - To monitoring climatic condition & recorded, arrange the client QC inspection. - To carried out the blasting & paint activity as per ITP & method statement the project specification. - Making final report and submit to client review and approval. [B]Duration [/B]: Oct- 2009 – March 2011 [B]Organization [/B]: ACERGY France S.A. Sharjha Branch (EPC) LOBITO YARD (ANGOLA) [B]Project Name Exxon [/B]: AB15 Gas Gathering and Kizomba Satellites Projects British Petroleum: Piles, Production Manifold and MSS Projects [B]Total [/B]: Buoy, Helipad, Pazflor subsea, Surf, Boat landing, Girri and Block 15 Projects. [B]Designation [/B]: Painting QC Supervisor [B]Responsibility [/B]: - Surveillance of contractor daily activities blasting & painting application, Paint mixing etc. - Project Supervision, Co-ordination of Sites activities with Foramens in order to complete the project on schedule And Interacting with Main contractors, client representatives and consultants on quality related matter. - Witness the surface preparation with contractor QC and client insp. - Checking of identical marking as marking drawing, involve in supervision of aqua marking installation to production manifolds jumpers, buoyancy tank, piles etc - Participating in quality walk and safety walk - Attending all QC meeting and discussing quality issues in meeting resolved the problem if any, improves the painting quality at site - Review the contractor QC report and submitted to client [B]Duration [/B]: Sep. 2008 – July 2009 [B]Organization [/B]: CAPE EAST LTD. (QATAR) [B]Project Name [/B]: SHELL PEARL GTL PROJECT [B]Designation [/B]: Painting Inspector [B] Responsibility:[/B] - Before commencing the work to check and recorded ambient temperature - To keeping proper records of paint being used including paint stock, batch certificate, expiry date, paint shelf life etc and - To maintain the QC inspection instrument calibration certificate log sheet and TPI certificate of Blasting and painting equipments - Daily Checking all blasting and painting equipment and connections - Doing quality test in the presence of client inspector like chloride test, surface profile reading, dust level - Doing the storage tank internal glass flack lining by using wet sponge holiday detector. - Monitoring climatic condition during blasting and application time and paint mixing, checking WFT and DFT reading on following day, do the visual inspection and rectify paint defect if any - Prepare final QC report and submit to client review and approval - Inspection/Documentation of blasting and painting operation of a project. Duration Aug. 2004 – July 2008 [b]Organization [/b]: CAPE EAST LTD. (QATAR) [b]Project Name [/b]: Train 4, 5, 6 and 7 RAS GAS EXPANTION PROJECT (LNG) Annual maintenance of Painting & insulation and annual shut down [b]Designation [/b]: Painting Inspector [b]Responsibility [/b]: - Execution and inspection of overall blasting and painting quality work - Inspection of scaffolding and signing tag. - Involved in supervision for refectory work of static equipments & fire proofing work - Responsible for quality of hot, cold & acoustic insulation and cladding work. - To read and understand isometric piping drawing as insulation code, painting code and executes the work as per super duplex, SS and CS pipe spool & structures - Involve in supervision for metalizing for high temperature pipe and static equipment and Belzona application - prepare final report and submit to the client review [b]Duration [/b]: July 2002 –March 2004 [b]Organization [/b]: APPILED CORROSION TECHNOLOGY [b]Project Name [/b]: KHALID PORT – SHARJAH (UAE) [b]Designation [/b]: Painting supervisor [b]Responsibility [/b]: - Execute and monitoring all blasting and paint work - Making daily work program as per schedule - Involve in supervision for production, involve in preparing progress report - Arrange blaster and painter qualification test periodically. [b]Duration [/b]: Aug. 2000 – May 2002 [b]Organization [/b]: NAFAL CONTRACTING & TRADING.LLC [b]Project Name [/b]: BBC – PROJECT - AL ASHKARA (OMAN) [b]Designation [/b]: Painting supervisor [b]Responsibility [/b]: - To get daily work schedule for site in charge and execute the work plan - Segregate the pipe and structure as per paint system - Separated the dissimilar material as per paint system. - Involve in supervision for daily progress. [b]Duration [/b]: Jan.1997 - May 2000 [b]Organization [/b]: JAI LAXMI ENTERPRISES [b]Project Name [/b]: VARIOUS SITES IN MUMBAI, (INDIA) [b]Designation [/b]: Painting supervisor [b]Duration [/b]: March 1994 – Nov. 1996 [b]Organization [/b]: SOUTHERN ALLIENCE ENGINEERS (INDIA) [b]Project Name [/b]: OFFSHORE – HEERA & NILAM PLATFORM, BPCL & RELIANCE PROJECT GUJARAT AND VARIOUS SITES (India) [b]Designation [/b]: Painting supervisor [b]Professional Experience [/b]: - Studying project specifications and making familiar with project quality requirements. - Check the Abrasives and blasting Activities and ensure the quality practice. - Checking Product identification, Packing condition, Documentation and verifying Delivery Notes Material Batch Certificates. - Visual inspection of Surface to be blast and painting. - Monitoring climatic condition including air and steel temperature, due point and Relative Humidity at all time. - Verification and inspection of surface preparation i.e. Surface profile, salt conductivity, dust level and Surface temperature prior to painting/coating application. - Verifying Materials meeting to paint system, Paint mixing ratio, and Pot life as per the Paint Product Data Sheet. - Check Wet Film Thickness (WFT), Dry Film Thickness (DFT) for each coat as per project /manufacturer’s recommendations. - Making periodical checks in contractors painting storage and paint application facilities to conform the proper storage, mixing, thinning, application methods and techniques to conform project painting/coating specification/manufacturers recommendations and international standards are met. - Visual Check on Storage Condition, Storage area, for adequate storage area and verify no Damage to painted items. - Check for Painted surface free from defects like Sagging, holidays, peel off, runs, orange peels etc. - Monitoring, inspection, witness and QC report generation as required. - Making arrangements for necessary Material Verification & Traceability, of painting/coating materials and availability of Batch and test certificates - Coordinating with Contractors representative, painting/coating inspectors, subcontractor representative and paint manufacturer to solve regularly quality related issues/problems rising on site on time to time basis. - Monitor the Contractor’s malpractice and report to the Engineer and rising NCR if applicable. - Conduct surveillance and witness on all physical testing including Holiday, Adhesion test carried by the Sub-contractors in related to coating inspection and testing procedure. - Follow the stage of inspection as per the ITP. - Verification of work performed by sub-contractor is in accordance with the Specification requirements. - Check Activities that are deviating from Project Specifications. - Attending kick off meeting, weekly quality meeting; participate in Quality walk, safety walk, and quality audit with - Client and contractors, subcontractor’s quality representative and solving project quality related problems. - Coordinating with external quality auditors to conduct the quality audits within company, contractor and taking Necessary action to close the NCR if any - Reporting and discussion to QAQC Engineer and QAQC Manager about all site issues. - Submission of Final Painting Inspection Report for Client’s final review[/QUOTE]