Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
HVAC Project Engineer : Resume
Ask Question / Post resume
Post a reply to the thread:
HVAC Project Engineer : Resume
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;241503]NAVEEDAHMED. M. DEHALVI [B]Email address [/B]: naveed_d AT rediffmail.com [B] PROFESSIONAL QUALIFICATION [/B]: Passed B.E. in MECHANICAL ENGINEERING [B]EDUCATIONAL QUALIFICATION [/B]: Passed SSC (XII) with First division from Karnataka board. Passed High School (X) with First division from Karnataka board [B]PROFESSIONAL EXPERIENCE [/B]: 7 years SHRI GURU HVAC SYSTEM FROM MAY2005 – till date} Presently working as HVAC PROJECT ENGINEER IN SHRI GURU HVAC SYSTEM (HITACHI DEALER) BANGLORE [B] Job Profile & Responsibilities [/B]: - Responsible for Installation project works involves Planning,Scheduling,Co-coordinating with main Clients, contractors, Sub-contractors, interacting with consultants, preparation of drawings, Heat Load Calculation, Technical submittal, approvals, procurement, installation, commissioning and hand over. It is also involve equipment/system sizing and selection, preparation of bill of quantity, material specification ,Tender/Bid evaluation, approval of shop drawing & periodic supervision & inspection of Installation work and providing input to site as and when required. [B]Project Undertaken [/B]: OMEGHA HELTH CARE (CALL CENTRE), BANGALORE Design, Supply, Installation, Testing & Commissioning of HVAC system for Electrical Control Building, Diesel Generator Room and Header & Valve Chamber of Pumping Station-C with Complete HVAC works comprising C.A/C unit having capacity of 250 Tr. along with Ducting, Insulation, Smoke Detector, Motorized Fire Damper & Building Automation system for all HVAC equipments. [B]C AND D CONSTRUCTION COMPANY :[/B] (HOTEL), BANGALORE Design, Supply, Installation, Testing & Commissioning of HVAC system comprising 14 nos. of Package units of capacity 80 Tr. along with required Ducting, Insulation & Cladding for New Engg. and Maintenance Building at C&D CONSTRUCTION Projects Company, Bangalore [B] CHALUKYA HOTEL IN WHITE FEIELD :[/B] BANGALORE Design, supply, Installation, Testing & Commissioning of Package unit of capacity of 80Tr.for the CHALUKA HOTEL BANGALORE [B]CITADE HOTEL :[/B] BANGALORE Supply & Installation of 2 Nos. Central split unit Along with required refrigerant piping connection work and Installation of 9 nos.Package A/C Units [B] MINISTRY OF MINI VEDHAN SAUDHA ASSEMBLY HALL : [/B]BANGALORE Complete Installation of HVAC system comprising 3 Nos. Air cooled Chiller of capacity 120 Tr. along with allied equipments like Pump, Expansion Tank, Air Separator, AHU’s, Fan Coil Unit, boxes, Piping Insulation & Cladding at all location with proper planning. [B] MISCHIFF SHOPING MALL IN : [/B]MANGLORE Complete Installation of HVAC System comprising 4 nos. Water cooled Chiller of capacity 500 Tr, 2 nos. Pumps, Expansion Tank, Air Separators, AHU’s, Fan Coil Unit and along with Valve, Piping, Ducting, Insulation etc. Mischiff shopping mall in Manglore [B] HAL AERO SHOW AT 2002 :[/B] Worked as a Jnr.Engineer (HVAC) and was responsible for Design, Supply, Installation, Testing & Commissioning of Various types of C.Split Unit /Package units, Duct Designing & planning of HVAC system. [B]COMPUTER SKILLS [/B]: Auto Cad, MS office.4M Intiall software [B]TRAINING [/B]: - HVAC design in 4m intill software - Heat Load calculation [B]PERSONAL INFORMATION [/B]: [B]Nationality [/B]: Indian [B]Languages Known [/B]: English, Hindi, Urdu, Marathi, Kannada [B]Marital Status [/B]: Married[/QUOTE]