Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
Resume : Power Plant Engineer
Ask Question / Post resume
Post a reply to the thread:
Resume : Power Plant Engineer
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=HEMAL.PATEL;237694][B]RESUME :[/B] PATEL HEMAL B. [B]E-mail [/B]: hemu_patel26 AT yahoo.com [B]Career Objective [/B]: With my engineering qualification and my experience in Thermal Power Plant, I'm looking forward for a challenging & rewarding career to enhance my own productivity at the same time achieving the organization objectives with teamwork. [B]Summary of Skills and Experience [/B]: - B.E. Mechanical and 4.2 years of experience in the filed of ‘Power Plant Engineering’ - Exposure with Commissioning and DCS Operation of power plant - Experience in performance monitoring and optimizing resource utilization. - Good adaptability with DCS operations, monitoring of field activity. [B]Educational Qualification [/B]: - B.E. (Mechanical) from Government Engineering College, North Gujarat University, in June 2008 with First Class Distinction with 72.10 % in last year. - H.S.C. from GSEB, Gandhinagar in March, 2004 with 63.54 % - S.S.C. from GSEB, Gandhinagar in March-April, 2002 with 86.00 % [B]WORK EXPERIENCE [/B]: [B]PRESENT EMPLOYER [/B]: [B]Firm [/B]: M/s GUJARAT INDUSTRIES POWER COMPANY LIMITED, SURAT [B]Designation [/B]: Engineer [B]Period [/B]: OCT 2008 to till date ( G.E.T- From 20TH Oct,2008 To 19TH Oct,2009) Now perform duty as a Engineer. [B]Plant Profile [/B]: - GIPCL Is independent power plant. - GIPCL SLPP has Presently total plant capacity is 500 MW (4*125 MW) LIGNITE based thermal power plant And CFBC (Circulating Fluidized Bed Combustion) Balance Draft, Natural Circulation Boiler BHEL Make Collaborated with LURGIE GERMANY Boiler unit 1 & 2(phase 1) (390 TPH, 132 Kg/cm², 540±5°c) . unit 3 & 4 (phase 2)(405 TPH,132 Kg/cm², 540±5°c) . - Reaction, Condensing , Two cylinder HP-IP Combined and Double Flow LP Turbine, Reheat-Regenerative type ( 6 extraction )Turbine (125 MW capacity of each turbine with overload valve capacity increase to 135 MW ) BHEL Make. - GIPCL has its two units (2*125 MW) are in operation from 2002. and 3rd & 4th unit’s generation on commercial based is started from May 2010. - The company has its own lignite mines at the same location. Lignite calorific value varied from 2800 kcal/kg to 3100 kcal/kg. [B]Job Profile [/B]: - I am presently working as a DCS Engineer in phase 2(unit 3&4 each capacity 2*125) after commissioning of unit 3&4 . - Testing of DCS logic, plant & individual equipments permissive & protections & DCS graphics modification if required. And monitoring of boiler and turbine parameter as well as BOP area. Shut down and startup activity. [B]PAST EMPLOYER (1) [/B]: [B]Firm [/B]: M/s NIRMA LIMITED, Bhavnagar [B]Designation [/B]: G.E.T( Graduate engineer trainee) [B]Period [/B]: 21TH JULY, 2008 TO 11TH OCT, 2008 [B]Plant profile [/B]: - M/s NIRMA has 1800 TPD Soda Ash plant & 40 MW Thermal Power Plant. [B]Job Profile [/B]: - Take training as well as parallel charge in a maintenance department of soda ash plant. - Exposure of Preventive, breakdown & annual shutdown maintenance. - Manpower scheduling and supervision of field activity. [B]PROFESSIONAL TRAINING [/B]: I have taken training at BHEL-TRICHY TRAINING CENTER on BOILER PERFORMANCE & LIFE EXTENSION FROM 02/02/2011 TO 08/02/2011. [B]Personal Details [/B]: [B]- Birth Date [/B]: 13th February, 1987 [B]- Marital Status [/B]: Married [B]- Language Known [/B]: Gujarati, English, Hindi HEMAL B. PATEL[/QUOTE]