Help
Home
Search the Forum
You are Here :
Forum
Lists
Placement Agencies
Iconium Consulting Group India Pvt Ltd Chennai
Ask Question / Post resume
Post a reply to the thread:
Iconium Consulting Group India Pvt Ltd Chennai
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;136531]SUBRAMANIAN OTTIKUTTI [b]E-mail [/b]: og_subramanian666 AT yahoo.com APPLICATION FOR THE POST OF CONTROL ROOM OPERATOR (OR) FIELD OPERATOR [b]CAREER OBJECTIVE [/b]: To pursue career as Operational Professional in Power Generation Industry. The core objective is to prove myself as good operation personnel in power industry. Very keen to acquaint the modern trends and to implement the latest concepts of this field to improve the assets of the organization. [b]EDUCATIONAL QUALIFICATION [/b]: Diploma in Mechanical Engineering from John Bosco Polytechnic, Tamil Nadu India in June 2003. [b]PROFESSIONAL PROFILE [/b]: 1. Working as Control room operator (CCR) in Dubai Electricity and water Authority “M” Station Power Project 2000MW Combined cycle power plant of 6X234 MW Siemens Gas Turbine V94.3A ( SGT5-4000F) & 3X217MW Alstom Steam turbine and 140 MIGD Desalination plant for Doosan Heavy Industries Co Ltd, an EPC company for since November 2008. To till 2. Worked as Central Control Room Operator (CCR) in Kamachi Sponge Iron Ltd - Captive thermal Power Plant (30MW) 3. Worked as Field Operator in Navabharat Ferro Alloys Captive thermal power Plant (50 MW) July 2003 to August 2006. [b]SKILL PROFILE [/b]: Having Around 8+ Years of Experience in Power Plant Operations as CCR and Field Operator [b]Employer [/b]: Doosan Heavy Industries Co Ltd, an Korean based EPC Company, DEWA- M station project, Jebel Ali, Dubai. [b]Operation experience [/b]: - Operation of Gas turbine with latest SPPA T3000 control system supplied by Siemens Germany. - Operation of gas turbine in open cycle as commissioning of HRSG & STG. - Monitoring the turbo supervisory parameters and logging the readings. - Configuration of the parameters to plot the trends and analyze the problems. - Familiar with single element and multiple element system control logics. - Take necessary action if there is deviation from normal condition. - Startup of the gas turbine and monitoring the Turbine parameters during start up. - Safe shutdown of the unit and running the GT on turning gear. - Operation of (BOP) Gas compressors, booster compressors, air compressors, N2 generation, GPRS Station, flare & PO change over system. - Changeover of LUB oil Pumps, LUB oil fins, fans and cooler & generator coolers. - Switching operation of 400KV GIS, 11KV,380V electrical system - Monitoring the parameters and operation of 370MVA power transformer, 55/65MVA unit auxiliary transformers and other LV auxiliary transformers. - Familiar with electrical distribution system of the plant including HRSG, GTG and Common Switchgear & PCC. - Synchronizing of the Gas turbine in both Auto mode and manual mode. - Knowledge with auto changeover schemes, HSBT system. - Familiar with operation of EDG (Diesel Generator). - Familiar with safe isolations of electrical system for PTW. - Co-ordinate with Shift charge engineers & Field operator in shifts. - Knowledge in GTG fire fighting system. - Knowledge in HVAC and chillers units. [b]Operation & Maintance experience [/b]: - Steam & Gas turbine, HRSG & HP Boiler start up & safe shut down works. - Handling of Emergency in power plant. - Inspection of all rotating & static equipments. - Boiler & turbine field & DCS operation. - Repair & maintance of all rotating & static equipments. - Supervising the operation of boiler turbine & balance of plant. - Co-ordinating with maintance department for fault rectification. - Continuous monitoring of process parameters & equipments status. - Alignment of rotating equipments. - All mechanical isolation & De-isolation for the shutdown & start-up operation. - Control of Air cooled condenser, closed cooling system, vacuum pulling & lube oil system. - Trouble shoot & root causes analysis of utility items. - Operation knowledge in waste water treatment, DM plant, sewage water & fire water. - Emergency operation for fire fighting Co2, foam release, hydrant (spingler) system. - A review of P&ID’s and verifies that the system in field is according to the drawing. [b]Employer [/b]: Kamachi Sponge Iron Ltd - Captive Power Plant (30MW) [b]Worked as Central Control Room Operator with modern DCS supplied by YOGOKAWA DCS supplied Yogokawa Bluestar from August 2006 to October 2008. Involved in Commissioning of the Plant mainly turbine and working in routine shifts and responsible for the safe and reliable operation of the plant with the following areas [/b]: - Commissioning activities of Turbine along with supplier, startup, and shutdown. - Having knowledge in testing carried out during commissioning, setting and emergency conditions. - Operations of 30 MW Turbine Siemens make having 16 stages, axial flow, single cylinder, condensing turbine without extractions. - Thorough knowledge in operation of Waste Heat Recovery Boiler (WHRB) thermo dyne make having Ten boilers. - Thorough knowledge in operation of turbine auxiliaries like condensate extraction pumps, de-aerator, Boiler feed water pump, ejectors, pressure reducing and de-super heating stations, centrifuge, turbine lube oil system - Knowledge in operation of cooling water pumps, auxiliary cooling pumps, cooling tower fans etc., - Knowledge in complete plant shutdown and start-up - Knowledge of standard check lists, operation procedures, isolation procedures, emergencies handling procedures of the plants etc - Knowledge of permit to work system - Knowledge of safety regulation of plants and fire fighting system - Knowledge in chemical dosing like HP dosing and LP dosing and water treatment plant [b]Employer [/b]: Navabharat Ferro Alloys Captive Power Plant- 50 MW (Thermal) [b]Worked as a “Field Operator “in Navabharat Ferro Alloys Captive Power Plant- 50 MW (Thermal) from Jun’03 to August 2006.I had been in routine shifts and worked in the following areas [/b]: - Operation of 50 MW Turbine (LMZ make) with 7 uncontrolled extraction, 21 stages, single cylinder, tandem compounding, condensing turbine with electro mechanical governing system. - Thorough knowledge in operation of turbine auxiliaries like condensate extraction pumps, de-aerator, Boiler feed water pump, ejectors, pressure reducing and de-super heating stations, centrifuge, turbine lube oil system. - Knowledge in operation of cooling water pumps, auxiliary cooling pumps, cooling tower fans etc., - Knowledge in make up water pumping station operation - Knowledge in (151 TPH X2) CFBC boiler, single drum top supported, natural circulation operation. - Knowledge in operation of boiler axillaries like coal feeders, roots blowers, soot blowers, ID fans, PA fans, SA fans, etc., - Operation of ash handling system and ESP. - Good knowledge in operation of reciprocating compressors (Chicago pneumatics make) double stage, 6kg/cm2 for instrument air & 3.5 kg/cm2 for ash handling - Operation of air drying unit in compressor house. - Operation of high pressure multi stage boiler feed water pump125 kg/cm2 (BHEL make), - Knowledge in chemical dosing like HP dosing and LP dosing and water treatment plant. - Knowledge in complete plant shutdown and start-up - Knowledge of safety regulation of plants and fire fighting system - Have knowledge in electrical switching operations in 440 V, 6.6 K.V, 11k.V substations etc. - Knowledge of standard check lists, operation procedures, isolation procedures, emergencies handling procedures of the plants etc - Knowledge of permit to work system [b]Emergency operations [/b]: - Drum level disturbance - Turbine trip and boiler running - Vacuum dropping - Cooling fans trip - D.C failure - D.C.S failure - Total station black out - Island mode operation - Sudden load rejection - Disturbance in grid and variation in frequency - Instrument compressor trip/ pressure low etc.,[/QUOTE]